In terms of installation, they require proper geometry, wrinkle control, and edge fixings. Maintenance involves liner inspections , partial replacement if perforation occurs, and consideration of maximum compatible temperatures.
| System | It works like | Fluid-steel contact | Chemical compatibility | Serving temperature | Maintenance |
|---|---|---|---|---|---|
| Mastic | Sealed joint | Yes (depending on the coating) | Moderate | High | Low |
| PVC liner | Complete barrier | No | Medium/High | Average | Half |
| EPDM liner | Complete barrier | No | High | Average | Half |